tongsan

Q
production process for corrugated pipe (corrugated pipe machine working process)
A
production process for corrugated pipe (corrugated pipe machine working process)
1. prepare the raw material 
PP/PVC/PP/EVA/PA granule 
PVC powder

2. if is pvc powder, it need mixing machine to mix all material together 

3. single/double screw extruder machine--die--mould--forming machine--automatic colier
single/double screw extruder machine--die--mould--forming machine--automatic shrink and cutting 

Previous:how to feed steel to the corrugated pipe ?